For the flooring on the main level of the house we choose to use concrete throughout. This meant engineering the floor structure to hold the weight of a 2″ thick concrete slab.
Monthly Archive January 2010
Roofing
The original 1004 Central had several layers of roofing upon its demise, including three layers of composition roofing atop what was likely the original cedar shake. For the new house we decided to go with a metal roof.







